Fabrication Project
Pure Fabrication

Fabrication Project

Behind every great build is our fabrication team working to the highest of standard. Quality in every cut, every weld, every finish. Pure Engineering Group is proud of our team building the mechanical works for classifed project in Dublin.

Click here for in-depth details on this project.

Almost 100 sheets of 304 stainless.

1.5mm 304 counters - strengthened & sound deadened, counter joints seamlessly welded on site.

Radius folded upstands on all units with large radius on counter front (to meet H2 hygiene standard).

Integrated 13A sockets in counters with hidden electrical void.

10 Sink bowls fully welded and polished internally & externally with 2" twist handle waste fittings & integrated overflow.

Localised anti-drip feature.

Over 50 cantilever tube legs Ø42mm (wall mounted) - Laser cut, welded & fully polished

40m of wall shelving with hidden mounting frames (radiused front & rear profiles).

Welded L-shaped corner mitres

10 Vertical service risers with removable panels and integrated WHBs

Over counter ambient gantries with recessed LED panel lighting supported from Ø42mm tube legs.

10 Wall mounted cabinets with dual hinged & lockable doors.

Fully panelled internally & externally with radiused joints inside for easy cleaning.

Removable and adjustable internal shelves.

Fully insulated & sound deadened.

Freestanding COSHH Cupboards with ventilated & lockable doors.

4 internal shelves removable and adjustable.

‍

Do you have a commercial mechanical engineering project?

Request a Free Consultation

REQUEST CONSULTATION